DTC C0500-12: Left Front Wheel Speed Sensor Circuit Short to Battery; DTC C0506-12: Right Front Wheel Speed Sensor Circuit Short to Battery [11/2018 - ]: Procedure
- CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.
*A for LH *B for RH *a Front view of wire harness connector
(to Front Speed Sensor)OK
The connector is securely connected.
- Disconnect the A91 or A92 front speed sensor connector.
- Check both the connector case and the terminals for deformation and corrosion.
OK
No deformation or corrosion.
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
FOR LHTester Connection Condition Specified Condition A92-1 (FL+) - A92-2 (FL-) Ignition switch ON 11 to 14 V FOR RHTester Connection Condition Specified Condition A91-1 (FR+) - A91-2 (FR-) Ignition switch ON 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE FRONT SPEED SENSOR. Refer to REMOVAL [11/2018 - ]
Result:
NG
See step 2
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.
- CHECK HARNESS AND CONNECTOR (FRONT SPEED SENSOR - BRAKE ACTUATOR ASSEMBLY)
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.
*A for LH *B for RH *a Front view of wire harness connector
(to Front Speed Sensor)OK
The connector is securely connected.
- Disconnect the A39 skid control ECU (brake actuator assembly) connector.
- Disconnect the A91 or A92 front speed sensor connector.
- Check both the connector case and the terminals for deformation and corrosion.
OK
No deformation or corrosion.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
FOR LHTester Connection Condition Specified Condition A92-2 (FL-) - Body ground Always Below 1.5 V FOR RHTester Connection Condition Specified Condition A91-2 (FR-) - Body ground Always Below 1.5 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 3
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.
- CHECK HARNESS AND CONNECTOR (FRONT SPEED SENSOR - BRAKE ACTUATOR ASSEMBLY)
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.
OK
The connector is securely connected.
- Disconnect the A39 skid control ECU (brake actuator assembly) connector.
- Disconnect the A91 or A92 front speed sensor connector.
- Check both the connector case and the terminals for deformation and corrosion.
OK
No deformation or corrosion.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
FOR LHTester Connection Condition Specified Condition A92-1 (FL+) or A39-24 (FL+) - A92-2 (FL-) or A39-7 (FL-) Always 10 kΩ or higher FOR RHTester Connection Condition Specified Condition A91-1 (FR+) or A39-21 (FR+) - A91-2 (FR-) or A39-26 (FR-) Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE BRAKE ACTUATOR ASSEMBLY. Refer to REMOVAL [11/2018 - 10/2019] , or refer to REMOVAL [10/2019 - 08/2020] , or refer to REMOVAL [08/2020 - 10/2022] , or refer to REMOVAL [10/2022 - 10/2023] , or refer to REMOVAL [10/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Make sure that there is no looseness at the locking part and the connecting part of the connectors.