Installation [11/2018 - 02/2019]: Procedure
- INSTALL REAR TRAILING ARM ASSEMBLY
- Using a transmission jack and a wooden block, support the rear No. 2 suspension arm assembly.NOTE:
- When jacking up the rear No. 2 suspension arm assembly, be sure to jack it up slowly.
- Make sure to perform this operation with the vehicle kept as low as possible.
- Install the rear trailing arm assembly to the vehicle with the 2 bolts.
Torque: 90 N.m (918 kgf/cm, 66 ft.lbf)
- Install the rear trailing arm assembly to the rear axle carrier sub-assembly with the 3 bolts and nut.
Bolt A
Torque: 135 N.m (1377 kgf/cm, 100 ft.lbf)
Bolt B
Torque: 75 N.m (765 kgf/cm, 55 ft.lbf)
- Using a transmission jack and a wooden block, support the rear No. 2 suspension arm assembly.
- INSTALL NO. 2 PARKING BRAKE WIRE ASSEMBLY
- Install the No. 2 parking brake wire assembly to the rear trailing arm assembly with the nut.
Torque: 15.5 N.m (158 kgf/cm, 11 ft.lbf)
- Engage the 2 clamps.
- Install the No. 2 parking brake wire assembly to the rear trailing arm assembly with the nut.
- INSTALL LOWER NO. 2 CONTROL ARM COVER (w/ Cover)
See step 9
- INSTALL NO. 2 FLOOR UNDER COVER (for Gasoline Model LH Side)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 12
- INSTALL NO. 1 FLOOR UNDER COVER (for Gasoline Model RH Side)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 10
- INSTALL FRONT FLOOR COVER LH (for Gasoline Model LH Side)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 13
- INSTALL FRONT FLOOR COVER RH (for Gasoline Model RH Side)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 11
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY (for Gasoline Model)
Refer to PROCEDURE - Step 99
- INSTALL NO. 1 ENGINE UNDER COVER (for Gasoline Model)
Refer to PROCEDURE - Step 100
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH (for Gasoline Model)
Refer to PROCEDURE - Step 101
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH (for Gasoline Model)
Refer to PROCEDURE - Step 102
- INSTALL REAR WHEEL
Refer to INSTALLATION [11/2018 - ]
- INSPECT AND ADJUST REAR WHEEL ALIGNMENT
Refer to ADJUSTMENT [11/2018 - 08/2020]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [11/2018 - 02/2019]