LO-beam Headlight does not Illuminate [06/2020 - 12/2021]: Procedure
- PERFORM ACTIVE TEST USING GTS
- Perform the Active Test according to the display on the GTS.
Body Electrical > Main Body > Active Test
Tester Display Measurement Item Control Range Diagnostic Note Low Beam Headlight Low beam headlights OFF or ON - Body Electrical > Main Body > Active Test
Tester Display Low Beam Headlight OK
Low beam headlights illuminate.
Result
Result Proceed to OK A NG (for LH Side) B NG (for RH Side) C
Result:
A
USE SIMULATION METHOD TO CHECK. Refer to HOW TO PROCEED WITH TROUBLESHOOTING [06/2020 - ]
Result:
C
See step 9
Result:
B
See step 2
- Perform the Active Test according to the display on the GTS.
- CHECK HEADLIGHT UNIT LH (LO TERMINAL VOLTAGE)
- Disconnect the headlight unit LH connector.
*a Front view of wire harness connector
(to Headlight Unit LH) - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition A62-1 (LO) - Body ground Light control switch in HEAD position 11 to 14 V Result
Proceed to OK NG
Result:
NG
See step 4
Result:
OK
See step 3
- Disconnect the headlight unit LH connector.
- CHECK HARNESS AND CONNECTOR (HEADLIGHT UNIT LH - BODY GROUND)
- Disconnect the headlight unit LH connector.
*a Front view of wire harness connector
(to Headlight Unit LH) - Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A62-2 (E) - Body ground Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE HEADLIGHT UNIT LH. Refer to REMOVAL [06/2020 - 12/2021]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Disconnect the headlight unit LH connector.
- INSPECT H-LP LH RELAY
Refer to ON-VEHICLE INSPECTION [06/2020 - ]
Result
Proceed to OK NG Result:
NG
REPLACE H-LP LH RELAY
Result:
OK
See step 5
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - HEADLIGHT UNIT LH)
- Remove the H-LP LH relay.
- Disconnect the A62 headlight unit LH connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 (H-LP LH relay) - A62-1 (LO) Always Below 1 Ω 3 (H-LP LH relay) or A62-1 (LO) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 6
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - BATTERY)
- Remove the H-LP LH relay.
*a Front view of wire harness connector
(to H-LP LH Relay) - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition 2 (H-LP LH relay) - Body ground Ignition switch off 11 to 14 V 5 (H-LP LH relay) - Body ground Ignition switch off 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 7
- Remove the H-LP LH relay.
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - POWER DISTRIBUTION BOX ASSEMBLY)
- Remove the H-LP LH relay.
- Disconnect the 4E power distribution box assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1 (H-LP LH relay) - 4E-6 Always Below 1 Ω 1 (H-LP LH relay) or 4E-6 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- CHECK POWER DISTRIBUTION BOX ASSEMBLY
- Remove the power distribution box assembly.
Refer to REMOVAL [06/2020 - 12/2021]
*a Component without harness connected
(Power Distribution Box Assembly)- - - Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.
Refer to REMOVAL [06/2020 - 12/2021]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 4E-6 - A-8 (HRLY) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [06/2020 - 12/2021]
Result:
NG
REPLACE POWER DISTRIBUTION BOX ASSEMBLY. Refer to REMOVAL [06/2020 - 12/2021]
- Remove the power distribution box assembly.
- CHECK HEADLIGHT UNIT RH (LO TERMINAL VOLTAGE)
- Disconnect the headlight unit RH connector.
*a Front view of wire harness connector
(to Headlight Unit RH) - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition A61-1 (LO) - Body ground Light control switch in HEAD position 11 to 14 V Result
Proceed to OK NG
Result:
NG
See step 11
Result:
OK
See step 10
- Disconnect the headlight unit RH connector.
- CHECK HARNESS AND CONNECTOR (HEADLIGHT UNIT RH - BODY GROUND)
- Disconnect the headlight unit RH connector.
*a Front view of wire harness connector
(to Headlight Unit RH) - Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A61-2 (E) - Body ground Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE HEADLIGHT UNIT RH. Refer to REMOVAL [06/2020 - 12/2021]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Disconnect the headlight unit RH connector.
- INSPECT H-LP RH RELAY
Refer to ON-VEHICLE INSPECTION [06/2020 - ]
Result
Proceed to OK NG Result:
NG
REPLACE H-LP RH RELAY
Result:
OK
See step 12
- CHECK HARNESS AND CONNECTOR (H-LP RH RELAY - HEADLIGHT UNIT RH)
- Remove the H-LP RH relay.
- Disconnect the A61 headlight unit RH connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 (H-LP RH relay) - A61-1 (LO) Always Below 1 Ω 3 (H-LP RH relay) or A61-1 (LO) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 13
- CHECK HARNESS AND CONNECTOR (H-LP RH RELAY - BATTERY)
- Remove the H-LP RH relay.
*a Front view of wire harness connector
(to H-LP RH Relay) - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition 2 (H-LP RH relay) - Body ground Ignition switch off 11 to 14 V 5 (H-LP RH relay) - Body ground Ignition switch off 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 14
- Remove the H-LP RH relay.
- CHECK HARNESS AND CONNECTOR (H-LP RH RELAY - POWER DISTRIBUTION BOX ASSEMBLY)
- Remove the H-LP RH relay.
- Disconnect the 4E power distribution box assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1 (H-LP RH relay) - 4E-10 Always Below 1 Ω 1 (H-LP RH relay) or 4E-10 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 15
- CHECK POWER DISTRIBUTION BOX ASSEMBLY
- Remove the power distribution box assembly.
Refer to REMOVAL [06/2020 - 12/2021]
*a Component without harness connected
(Power Distribution Box Assembly)- - - Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.
Refer to REMOVAL [06/2020 - 12/2021]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 4E-10 - A-9 (HRY2) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [06/2020 - 12/2021]
Result:
NG
REPLACE POWER DISTRIBUTION BOX ASSEMBLY. Refer to REMOVAL [06/2020 - 12/2021]
- Remove the power distribution box assembly.