LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Prius LE AWD-e >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> HEADUP Display - Diagnostic Codes & Circuit Tests >> HEADUP Display System >> Circuit Tests >> Main Switch Circuit [11/2015 - ] >> Procedure

Main Switch Circuit [11/2015 - ]: Procedure

  1. READ VALUE USING TECHSTREAM (MAIN SWITCH) 
    1. Connect the Techstream to the DLC3.
    2. Turn the power switch on (IG).
    3. Turn the Techstream on.
    4. Enter the following menus: Body Electrical / Head Up Display / Data List.
    5. Read the Data List according to the display on the Techstream.

      Body Electrical > Head Up Display > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      Main Switch Headup display switch (No. 2 combination switch assembly) OFF or ON OFF: Switch released
      ON: Switch pushed
      -

      Body Electrical > Head Up Display > Data List 

      Tester Display
      Main Switch

      OK

      Headup display switch (No. 2 combination switch assembly) condition displayed on the Techstream changes with the actual switch operation.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER MIRROR ECU. Refer to  DISASSEMBLY [11/2015 - ] 

    Result: 

    NG 

    See step  2

  2. INSPECT HEADUP DISPLAY SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY) 
    1. Remove the headup display switch (No. 2 combination switch assembly).

      Refer to REMOVAL [11/2015 - ]

    2. Inspect the headup display switch (No. 2 combination switch assembly).

      Refer to INSPECTION [11/2015 - ]

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPLACE HEADUP DISPLAY SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY). Refer to  REMOVAL [11/2015 - ] 

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (COMBINATION METER MIRROR ECU - HEADUP DISPLAY SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY)) 
    1. Disconnect the G7 combination meter mirror ECU connector.
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      (G7)

      (F49)

      (G7)

      (F49)

      Tester Connection Condition Specified Condition
      G7-16 (SW1) - F49-3 (ILU) Always Below 1 Ω
      G7-11 (E) - F49-10 (E) Always Below 1 Ω
      G7-16 (SW1) or F49-3 (ILU) - Body ground Always 10 kΩ or higher
      G7-11 (E) or F49-10 (E) - Body ground Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER MIRROR ECU. Refer to  DISASSEMBLY [11/2015 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR