LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Mirai XLE >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge System - Service Information >> HEADUP Display >> Installation [11/2021 - 12/2022] >> Procedure

Installation [11/2021 - 12/2022]: Procedure

  1. INSTALL METER MIRROR SUB-ASSEMBLY 

    HINT: 

    The illustrations are representative examples, and details may differ.

    1. Fig 1: Meter Mirror Sub-Assembly Tightening Sequence
      GTY992281Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Connect each connector.
      2. Temporarily install the meter mirror sub-assembly with the 3 bolts.
      3. Tighten the 3 bolts in the order shown in the illustration, install the meter mirror sub-assembly.

        Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

  2. INSTALL INSTRUMENT PANEL SAFETY PAD 

    Refer to INSTALLATION [11/2020 - 12/2022]

  3. INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL 

    Refer to WORK PROCEDURE [11/2020 - 12/2022]

    HINT: 

    When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.

    Refer to AUTOMATIC LEARNING CHART [11/2021 - 12/2023]