Installation [11/2020 - 11/2021]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY
HINT:
The illustrations are representative examples, and details may differ.
-
- Connect each connector.
- Temporarily install the meter mirror sub-assembly with the 3 bolts.
- Tighten the 3 bolts in the order shown in the illustration, install the meter mirror sub-assembly.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
-
- INSTALL INSTRUMENT PANEL SAFETY PAD
Refer to INSTALLATION [11/2020 - 12/2022]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2020 - 12/2022]
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.