Air Conditioning Amplifier Communication Stop Mode [11/2020 - 12/2022]: Procedure
- CHECK FOR OPEN IN CAN BUS WIRE (AIR CONDITIONING AMPLIFIER ASSEMBLY BRANCH WIRE)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the D81 air conditioning amplifier assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D81-2 (CANH) - D81-1 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 54 to 69 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE CAN BRANCH WIRE OR CONNECTOR
Result:
OK
See step 2
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D81-17 (GND) - Body ground Cable disconnected from negative (-) auxiliary battery terminal Below 1 Ω - Reconnect the cable to the negative (-) auxiliary battery terminal.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition D81-5 (B) - Body ground Ignition switch ON 11 to 14 V D81-6 (IG+) - Body ground Ignition switch ON 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY. Refer to REMOVAL [11/2020 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Measure the resistance according to the value(s) in the table below.