Installation [11/2020 - 11/2021]: Procedure
- INSTALL IMMOBILIZER CODE ECU (ID CODE BOX)
- INSTALL AIR CONDITIONER UNIT ASSEMBLY
Refer to INSTALLATION [11/2020 - 12/2022]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2020 - 12/2022]
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.
- PERFORM CODE REGISTRATION
Refer to REGISTRATION [11/2020 - 12/2022]