Installation [08/2015 - ]: Procedure
- INSTALL LIGHT CONTROL RHEOSTAT
- Attach the 2 claws to install the light control rheostat.
- INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
See step 2
- INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Refer to PROCEDURE - Step 35 [08/2015 - ]
- INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Refer to PROCEDURE - Step 36 [08/2015 - ]
- INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 12 [08/2015 - ]
- INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
Refer to PROCEDURE - Step 13 [08/2015 - ]
- ENABLE AUTOAWAY/RETURN FUNCTION
- Restore the autoaway/return function setting to the previous condition by changing the customize parameter (Refer to CUSTOMIZE PARAMETERS [08/2015 - ] ).