LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Highlander Platinum, FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Engine Mechanical System (T24A-FTS) - Service Information (1 Of 2)) >> Camshaft >> Installation [10/2022 - ] >> Procedure

Installation [10/2022 - ]: Procedure

WARNING: This page is about a different car, the 2025 Toyota Highlander, 2024 Toyota Highlander, and 2023 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL VALVE STEM CAP 

    Refer to PROCEDURE - Step 17

  2. INSTALL VALVE LASH ADJUSTER ASSEMBLY 

    Refer to PROCEDURE - Step 18

  3. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 19

  4. INSTALL EXHAUST CAMSHAFT SUB-ASSEMBLY 
    1. GTY1103555Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Clean the exhaust camshaft sub-assembly journals and camshaft housing sub-assembly.
      2. Apply a light coat of engine oil to the exhaust camshaft sub-assembly journals and camshaft housing sub-assembly.
      3. Install the exhaust camshaft sub-assembly to the camshaft housing sub-assembly.
    2. Perform "Inspection After Repair" after replacing the exhaust camshaft sub-assembly.

      Refer to INITIALIZATION [10/2022 - ]

  5. INSTALL INTAKE CAMSHAFT SUB-ASSEMBLY 
    1. GTY1104709Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Clean the intake camshaft sub-assembly journals and camshaft housing sub-assembly.
      2. Apply a light coat of engine oil to the intake camshaft sub-assembly journals and camshaft housing sub-assembly.
      3. Install the intake camshaft sub-assembly to the camshaft housing sub-assembly.
    2. Perform "Inspection After Repair" after replacing the intake camshaft sub-assembly.

      Refer to INITIALIZATION [10/2022 - ]

  6. INSTALL CAMSHAFT BEARING CAP 

    Refer to PROCEDURE - Step 22

  7. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 23

  8. INSTALL FUEL PUMP LIFTER GUIDE 

    Refer to PROCEDURE - Step 24

  9. INSTALL TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 26

  10. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 27

  11. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 28

  12. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 29

  13. INSTALL CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 30

  14. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 31

  15. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 32

  16. INSTALL NO. 2 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 33

  17. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 34

  18. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 

    Refer to PROCEDURE - Step 32

  19. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 36

  20. INSTALL TIMING CHAIN CASE OIL SEAL 

    See step  1

  21. INSTALL INJECTOR HOLDER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 39

  22. INSTALL SPARK PLUG TUBE GASKET 

    Refer to PROCEDURE - Step 40

  23. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 41

  24. INSTALL CRANKSHAFT PULLEY ASSEMBLY 

    Refer to PROCEDURE - Step 42

  25. INSTALL FUEL INJECTOR SEAL 

    Refer to PROCEDURE - Step 1

  26. INSTALL INJECTOR VIBRATION INSULATOR 

    Refer to PROCEDURE - Step 2

  27. INSTALL C-RING 

    Refer to PROCEDURE - Step 3

  28. INSTALL NO. 1 FUEL INJECTOR BACK-UP RING 

    Refer to PROCEDURE - Step 4

  29. INSTALL NO. 3 FUEL INJECTOR BACK-UP RING 

    Refer to PROCEDURE - Step 5

  30. INSTALL NOZZLE HOLDER CLAMP 

    Refer to PROCEDURE - Step 6

  31. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 7

  32. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 8

  33. INSTALL VACUUM PUMP ASSEMBLY 

    Refer to PROCEDURE - Step 1

  34. INSTALL CAM TIMING OIL CONTROL SOLENOID O-RING 

    Refer to PROCEDURE - Step 1

  35. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side) 

    Refer to PROCEDURE - Step 2

  36. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (for Exhaust Side) 

    Refer to PROCEDURE - Step 3

  37. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 1

  38. INSTALL NO. 1 HEAT INSULATOR BRACKET 

    Refer to PROCEDURE - Step 5

  39. INSTALL WATER BY-PASS GASKET 

    Refer to PROCEDURE - Step 7

  40. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 8

  41. INSTALL WATER BY-PASS HOSE 

    Refer to PROCEDURE - Step 9

  42. INSTALL EXHAUST PIPE HEAT INSULATOR 

    Refer to PROCEDURE - Step 5

  43. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  44. INSTALL FUEL PUMP LIFTER ASSEMBLY 

    Refer to PROCEDURE - Step 1 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 1 [11/2023 - ]

  45. INSTALL FUEL PUMP SPACER GASKET 

    Refer to PROCEDURE - Step 2 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 2 [11/2023 - ]

  46. TEMPORARILY INSTALL FUEL PUMP ASSEMBLY 

    Refer to PROCEDURE - Step 3 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 3 [11/2023 - ]

  47. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 4 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 4 [11/2023 - ]

  48. INSTALL FUEL PUMP ASSEMBLY 

    Refer to PROCEDURE - Step 5 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 5 [11/2023 - ]

  49. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 6 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 6 [11/2023 - ]

  50. CONNECT FUEL TUBE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 7 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 7 [11/2023 - ]

  51. CONNECT WATER OUTLET STAY 

    Refer to PROCEDURE - Step 28

  52. CONNECT NO. 3 TURBO WATER HOSE 

    Refer to PROCEDURE - Step 6

  53. CONNECT NO. 2 TURBO WATER HOSE 

    Refer to PROCEDURE - Step 7

  54. INSTALL COMPRESSOR INLET ELBOW SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 11

  55. INSTALL VACUUM REGULATING VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 1

  56. CONNECT NO. 2 FUEL VAPOR FEED HOSE 

    Refer to PROCEDURE - Step 14

  57. INSTALL AIR TUBE ASSEMBLY 

    Refer to PROCEDURE - Step 15

  58. CONNECT NO. 1 VENTILATION PRESSURE SENSOR HOSE 

    Refer to PROCEDURE - Step 51

  59. INSTALL PURGE VALVE (PURGE VSV) 

    Refer to PROCEDURE - Step 16

  60. INSTALL NO. 2 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 19

  61. INSTALL ENGINE HANGERS 

    See step  50 [10/2022 - 11/2023], or see step  50 [11/2023 - ]

  62. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND 

    Refer to INSTALLATION [10/2022 - 11/2023] , or refer to INSTALLATION [11/2023 - ]