LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Camry LE, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 48 (Transfer Case - Service Information (Except Hybrid)) >> Transfer Assembly >> Installation [03/2020 - 10/2020] >> Procedure

Installation [03/2020 - 10/2020]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL TRANSFER ASSEMBLY 
    1. For Type A:
      1. Clean the bolt holes.
      2. Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 6 nuts and 2 new bolts.
        GTY912826Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a 17 mm Union Nut Wrench
        *b Torque Wrench Fulcrum Length
        • SST: 09961-00950 

        Specified tightening torque 

        Torque: 68.6 N*m (700 kgf*cm, 51 ft.*lbf) 

        HINT: 

        • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

          Refer to PRECAUTION [03/2020 - ]

        • When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + SST (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 40.2 N*m (410 kgf*cm, 30 ft.*lbf)
    2. For Type B:
      1. Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.
        GTY875942Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a 17 mm Union Nut Wrench
        *b Torque Wrench Fulcrum Length
        • SST: 09961-00950 

        Specified tightening torque 

        Torque: 68.6 N*m (700 kgf*cm, 51 ft.*lbf) 

        HINT: 

        • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

          Refer to PRECAUTION [03/2020 - ]

        • When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + SST (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 40.2 N*m (410 kgf*cm, 30 ft.*lbf)
  2. INSTALL REAR ENGINE MOUNTING BRACKET SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 12

  3. INSTALL NO. 1 PROPELLER SHAFT HEAT INSULATOR BRACKET SUB-ASSEMBLY 
    1. Install the No. 1 propeller shaft heat insulator bracket sub-assembly to the transfer assembly with the 2 bolts.

      Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf) 

  4. INSTALL PROPELLER SHAFT HEAT INSULATOR 

    Refer to PROCEDURE - Step 13

  5. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY 

    Refer to INSTALLATION [03/2020 - 10/2020]