Power Source Circuit [09/2019 - 08/2020]: Procedure
- CHECK HARNESS AND CONNECTOR (HEADLIGHT ECU SUB-ASSEMBLY - POWER SOURCE AND BODY GROUND)
- Disconnect the A95*1 or A16*2 headlight ECU sub-assembly LH connector.
- *1: for TMMT Made
- *1: for TMC Made
- Disconnect the A17 headlight ECU sub-assembly RH connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
HEADLIGHT ECU SUB-ASSEMBLY LHTester Connection Switch Condition Specified Condition A95-13 (ECUB) - Body ground*1 Engine switch on (IG) 11 to 14 V A95-4 (IG) - Body ground*1 Engine switch on (IG) 11 to 14 V A16-13 (ECUB) - Body ground*2 Engine switch on (IG) 11 to 14 V A16-4 (IG) - Body ground*2 Engine switch on (IG) 11 to 14 V - *1: for TMMT Made
- *1: for TMC Made
HEADLIGHT ECU SUB-ASSEMBLY RHTester Connection Switch Condition Specified Condition A17-13 (ECUB) - Body ground Engine switch on (IG) 11 to 14 V A17-4 (IG) - Body ground Engine switch on (IG) 11 to 14 V - Measure the resistance according to the value(s) in the table below.
Standard Resistance
HEADLIGHT ECU SUB-ASSEMBLY LHTester Connection Condition Specified Condition A95-12 (GND) - Body ground*1 Always Below 1 Ω A16-12 (GND) - Body ground*2 Always Below 1 Ω - *1: for TMMT Made
- *1: for TMC Made
HEADLIGHT ECU SUB-ASSEMBLY RHTester Connection Condition Specified Condition A17-12 (GND) - Body ground Always Below 1 Ω Result
Result Proceed to OK A NG (Headlight ECU Sub-assembly LH) B NG (Headlight ECU Sub-assembly RH) C
Result:
A
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [09/2019 - 08/2020]
Result:
C
See step 6
Result:
B
See step 2
- Disconnect the A95*1 or A16*2 headlight ECU sub-assembly LH connector.
- INSPECT NO. 1 INTEGRATION RELAY (H-LP LH RELAY)
- Remove the No. 1 integration relay from the No. 1 engine room relay block.
Refer to REMOVAL [02/2017 - 08/2020]
- Inspect the No. 1 integration relay.
Refer to INSPECTION [02/2017 - ]
OK
No. 1 integration relay is normal.
Result
Proceed to OK NG
Result:
NG
REPLACE NO. 1 INTEGRATION RELAY. Refer to REMOVAL [02/2017 - 08/2020]
Result:
OK
See step 3
- Remove the No. 1 integration relay from the No. 1 engine room relay block.
- CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY (H-LP LH RELAY) - BATTERY)
- Measure the voltage according to the value(s) in the chart below.
Standard Voltage
Tester Connection Condition Specified Condition 1A-5 - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- Measure the voltage according to the value(s) in the chart below.
- CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the 3F instrument panel junction block assembly connector.
- Measure the resistance according to the value(s) in the chart below.
Standard Resistance
Tester Connection Condition Specified Condition 1B-2 - 3F-31 Always Below 1 Ω 1B-2 or 3F-31 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 5
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the instrument panel junction block assembly.
Refer to REMOVAL [10/2017 - 08/2020]
- Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
- Measure the resistance according to the value(s) in the chart below.
*a Component without harness connected
(Instrument Panel Junction Block Assembly)- - Standard Resistance
Tester Connection Condition Specified Condition 3F-31 - MB-15 (HRLY) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [10/2017 - 08/2020]
Result:
NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY. Refer to REMOVAL [10/2017 - 08/2020]
- Remove the instrument panel junction block assembly.
- INSPECT NO. 1 INTEGRATION RELAY (H-LP RH RELAY)
- Remove the No. 1 integration relay from the No. 1 engine room relay block.
Refer to REMOVAL [02/2017 - 08/2020]
- Inspect the No. 1 integration relay.
Refer to INSPECTION [02/2017 - ]
OK
No. 1 integration relay is normal.
Result
Proceed to OK NG
Result:
NG
REPLACE NO. 1 INTEGRATION RELAY. Refer to REMOVAL [02/2017 - 08/2020]
Result:
OK
See step 7
- Remove the No. 1 integration relay from the No. 1 engine room relay block.
- CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY (H-LP RH RELAY) - BATTERY)
- Measure the voltage according to the value(s) in the chart below.
Standard Voltage
Tester Connection Condition Specified Condition 1B-8 - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- Measure the voltage according to the value(s) in the chart below.
- CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Disconnect the F15 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the chart below.
Standard Resistance
Tester Connection Condition Specified Condition 1A-11 - F15-1 (DIM) Always Below 1 Ω 1A-11 or F15-1 (DIM) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [10/2017 - 08/2020]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR