Installation [05/2018 - 09/2019]: Procedure
- INSTALL CLOCK ASSEMBLY
- INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY (w/o Display)
Refer to PROCEDURE - Step 20
- INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY WITH BRACKET (w/ Display)
Refer to INSTALLATION [05/2018 - 09/2019]