Installation [08/2015 - ]: Procedure
- INSTALL AUTOMATIC LIGHT CONTROL SENSOR (SOLAR SENSOR)
- Attach the 2 claws to install the sensor.
- Connect the connector.
- INSTALL NO. 3 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 8 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 9 [08/2019 - 08/2022] , or refer to PROCEDURE - Step 9 [08/2022 - ]
- INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
Refer to PROCEDURE - Step 9 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 10 [08/2019 - 08/2022] , or refer to PROCEDURE - Step 10 [08/2022 - ]
- INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
Refer to PROCEDURE - Step 10 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 11 [08/2019 - 08/2022] , or refer to PROCEDURE - Step 11 [08/2022 - ]
- INSTALL NO. 2 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 11 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 12 [08/2019 - 08/2022] , or refer to PROCEDURE - Step 12 [08/2022 - ]
- INSTALL NO. 1 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 12 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 13 [08/2019 - 08/2022] , or refer to PROCEDURE - Step 13 [08/2022 - ]
- INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
- Install the instrument panel sub-assembly (Refer to INSTALLATION [08/2015 - 08/2019] , or refer to INSTALLATION [08/2019 - 08/2022] , or refer to INSTALLATION [08/2022 - ] ).