LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> 4Runner TRD Pro >> Repair and Diagnosis >> Electrical >> Gauges >> Interior Panels / Trim - Service Information >> Front Console Box >> Installation [08/2019 - ] >> Procedure

Installation [08/2019 - ]: Procedure

  1. INSTALL REAR CONSOLE BOX ASSEMBLY 
    1. Connect each connector.
    2. Attach the 2 guides.
    3. Install the rear console box assembly with the 4 bolts and 2 screws.
  2. INSTALL NO. 2 CONSOLE BOX RETAINER 
    1. Attach the clip, 2 claws and 2 guides to install the No. 2 console box retainer.
  3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 
    1. Connect each connector.
    2. Attach the 10 clips to install the upper console panel sub-assembly.
      GTY448497Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *A for VF2A *B for VF2CM, VF4BM
      *C for 2WD - -
  4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A) 
    1. Install the shift lever knob sub-assembly and turn it in the direction indicated by the arrow.
      GTY442501Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 
    1. Install the shift lever knob sub-assembly and turn it in the direction indicated by the arrow.
      GTY442500Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT 
    1. Attach the 2 clips and 2 guides to install the front No. 1 console box insert.
  7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT 
    1. Attach the 2 clips and guide to install the front No. 2 console box insert.
  8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH 
    1. Attach the 5 clips to install the No. 1 instrument cluster finish panel garnish.
  9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH 

    Refer to PROCEDURE - Step 3