LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> 4Runner TRD Pro >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> Combination Meter >> Installation [08/2015 - 08/2022] >> Procedure

Installation [08/2015 - 08/2022]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connectors.
    2. Install the combination meter with the 4 screws.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY 
    1. Attach the 7 claws to install the finish panel.
    2. Attach the 4 claws.
  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 24 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 23 [08/2019 - 08/2022]

  4. INSTALL NO. 2 SWITCH HOLE BASE 

    Refer to PROCEDURE - Step 23 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 22 [08/2019 - 08/2022]

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2019] , or refer to INITIALIZATION [08/2019 - 08/2022] ).