Parking Assist ECU Communication Stop Mode [11/2018 - 02/2019]: Procedure
WARNING: This page is about a different variant/trim than selected.
- CHECK FOR OPEN IN CAN BUS WIRE (PARKING ASSIST ECU BRANCH WIRE)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the parking assist ECU connector.
*a Front view of wire harness connector
(to Parking Assist ECU) - Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N25-11 (CANH) - N25-12 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 54 to 69 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE CAN BRANCH WIRE OR CONNECTOR
Result:
OK
See step 2
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N25-4 (GND1) - Body ground Cable disconnected from negative (-) auxiliary battery terminal Below 1 Ω *a Front view of wire harness connector
(to Parking Assist ECU) - Reconnect the cable to the negative (-) auxiliary battery terminal.NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [11/2018 - 02/2019]
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition N25-1 (+B) - Body ground Power switch off 11 to 14 V N25-2 (ACC) - Body ground Power switch on (IG) 11 to 14 V Power switch off Below 1 V N25-3 (IG) - Body ground Power switch on (IG) 11 to 14 V Power switch off Below 1 V Result
Proceed to OK NG
Result:
OK
REPLACE PARKING ASSIST ECU
Refer to REMOVAL [11/2018 - 10/2022]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Measure the resistance according to the value(s) in the table below.