Caution / Notice / Hint
WARNING: This page is about a different variant/trim than selected.
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during throttle body with motor assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
|
Inspection after repair |
|
w/ Canister Pump Module: Refer to INITIALIZATION [02/2019 - 10/2019]
, or refer to INITIALIZATION [10/2019 - 08/2020] w/o Canister Pump Module: Refer to INITIALIZATION [11/2018 - 08/2020] |
NOTE:
This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Refer to PRECAUTION [11/2018 - ]