Installation [02/2019 - ]: Procedure
- INSTALL FUEL SENDER GAUGE ASSEMBLY
- Attach the 2 claws and install the fuel sender gauge assembly.
- Attach the clamp and connect the wire harness.NOTE:
Do not damage the wire harness.
- Attach the clamp and connect the wire harness.NOTE:
Do not damage the wire harness.
- Connect the 3 connectors to the fuel suction plate sub-assembly.
- INSTALL FUEL SUCTION WITH PUMP AND GAUGE TUBE ASSEMBLY
Refer to INSTALLATION [02/2019 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [02/2019 - 10/2019] , or refer to INITIALIZATION [10/2019 - 06/2020] , or refer to INITIALIZATION [06/2020 - 08/2020] , or refer to INITIALIZATION [08/2020 - 12/2021] , or refer to INITIALIZATION [12/2021 - 10/2022] , or refer to INITIALIZATION [10/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- INSTALL BATTERY HOLE COVER
Refer to PROCEDURE - Step 3 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 3 [08/2020 - ]
- INSTALL REAR NO. 2 FLOOR BOARD
Refer to PROCEDURE - Step 4 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 4 [08/2020 - ]
- INSTALL DECK BOARD ASSEMBLY
Refer to PROCEDURE - Step 5 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 5 [08/2020 - ]