Installation [12/2021 - ]: Procedure
- INSTALL BRAKE PEDAL PAD
- Install the brake pedal pad to the brake pedal support assembly.
HINT:
Installation is easier after applying a small amount of soapy water.
- Install the brake pedal pad to the brake pedal support assembly.
- INSTALL STOP LIGHT SWITCH MOUNTING ADJUSTER
- Engage the 2 claws to install the stop light switch mounting adjuster.
- INSTALL BRAKE PEDAL SUPPORT ASSEMBLY
- Temporarily install the brake pedal support assembly with the 2 new clips while avoiding the stud bolts of the brake booster with master cylinder assembly and brake booster support base.NOTE:
Be careful not to deform the bracket of the instrument panel reinforcement assembly.
- Install the brake pedal support assembly with the bolt and 4 nuts.
Bolt
Torque: 15 N.m (153 kgf/cm, 11 ft.lbf)
Nut
Torque: 12.7 N.m (130 kgf/cm, 9 ft.lbf)
- Temporarily install the brake pedal support assembly with the 2 new clips while avoiding the stud bolts of the brake booster with master cylinder assembly and brake booster support base.
- INSTALL PUSH ROD PIN
- Apply lithium soap base glycol grease to the push rod pin.
Lithium Soap Base Glycol Grease - Connect the master cylinder push rod clevis to the brake pedal support assembly with the push rod pin, and install a new clip as shown in the illustration.NOTE:
Be sure to install the push rod pin in the correct direction.
- Apply lithium soap base glycol grease to the push rod pin.
- INSTALL BRAKE PEDAL RETURN SPRING
- CONNECT ENGINE ROOM MAIN WIRE
- Engage the 2 clamps to install the engine room main wire to the brake pedal support assembly.
- INSTALL STOP LIGHT SWITCH ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL BRAKE PEDAL STROKE SENSOR ASSEMBLY
Refer to PROCEDURE - Step 4
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
HINT:
It is necessary to connect the cable to the negative (-) auxiliary battery terminal in order to perform the brake pedal inspection and adjustment.
- INSPECT AND ADJUST BRAKE PEDAL
Refer to ADJUSTMENT [12/2021 - ]
- DISCONNECT CABLE FROM NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 5 [12/2021 - 10/2022] , or refer to PROCEDURE - Step 5 [10/2022 - 10/2023] , or refer to PROCEDURE - Step 5 [10/2023 - ]
- INSTALL NO. 1 AIR DUCT (for TMC Made)
Refer to PROCEDURE - Step 7
- INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY (for TMMC Made)
Refer to PROCEDURE - Step 8
- INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY
Refer to INSTALLATION [08/2020 - ]
- PERFORM CALIBRATION
Refer to UTILITY [12/2021 - ]
- CHECK AND CLEAR DTC
Refer to DTC CHECK / CLEAR [12/2021 - ]