Installation [11/2018 - 08/2020]: Procedure
- INSTALL CYLINDER HEAD GASKET
- Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
- Place a new cylinder head gasket on the cylinder block sub-assembly with the Lot No. stamp facing upward.
*a Lot No. Front of Engine NOTE:Make sure that the cylinder head gasket is installed in the correct orientation.
- INSTALL CYLINDER HEAD SUB-ASSEMBLY
Refer to PROCEDURE - Step 19 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 19 [06/2020 - 08/2020]
- INSTALL NO. 2 CAMSHAFT
Refer to PROCEDURE - Step 22 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 22 [06/2020 - 08/2020]
- INSTALL CAMSHAFT
Refer to PROCEDURE - Step 23 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 23 [06/2020 - 08/2020]
- INSTALL CAMSHAFT BEARING CAP
Refer to PROCEDURE - Step 24 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 24 [06/2020 - 08/2020]
- INSTALL VALVE STEM CAP
Refer to PROCEDURE - Step 25 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 25 [06/2020 - 08/2020]
- INSTALL VALVE LASH ADJUSTER ASSEMBLY
Refer to PROCEDURE - Step 26 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 26 [06/2020 - 08/2020]
- INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
Refer to PROCEDURE - Step 27 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 27 [06/2020 - 08/2020]
- INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY
Refer to PROCEDURE - Step 28 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 28 [06/2020 - 08/2020]
- INSTALL FUEL PUMP LIFTER GUIDE
Refer to PROCEDURE - Step 29 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 29 [06/2020 - 08/2020]
- INSTALL TIMING CHAIN COVER ASSEMBLY
Refer to PROCEDURE - Step 32 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 32 [06/2020 - 08/2020]
- INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY
Refer to PROCEDURE - Step 33 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 33 [06/2020 - 08/2020]
- SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Refer to PROCEDURE - Step 34 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 41 [06/2020 - 08/2020]
- INSTALL NO. 1 CHAIN VIBRATION DAMPER
Refer to PROCEDURE - Step 35 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 35 [06/2020 - 08/2020]
- INSTALL CHAIN TENSIONER SLIPPER
Refer to PROCEDURE - Step 36 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 36 [06/2020 - 08/2020]
- INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 37 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 37 [06/2020 - 08/2020]
- INSTALL CHAIN SUB-ASSEMBLY
Refer to PROCEDURE - Step 38 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 38 [06/2020 - 08/2020]
- INSTALL CAMSHAFT TIMING GEAR ASSEMBLY
Refer to PROCEDURE - Step 39 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 39 [06/2020 - 08/2020]
- INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY
Refer to PROCEDURE - Step 40 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 40 [06/2020 - 08/2020]
- SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Refer to PROCEDURE - Step 31 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 31 [06/2020 - 11/2024]
- INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY
Refer to PROCEDURE - Step 42 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 42 [06/2020 - 08/2020]
- INSTALL TIMING CHAIN COVER OIL SEAL
See step 1
- INSTALL SPARK PLUG TUBE GASKET
Refer to PROCEDURE - Step 45 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 45 [06/2020 - 08/2020]
- INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 46 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 46 [06/2020 - 08/2020]
- INSTALL OUTLET WATER BY-PASS SUB-ASSEMBLY
Refer to PROCEDURE - Step 47 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 47 [06/2020 - 08/2020]
- INSTALL WATER OUTLET
Refer to PROCEDURE - Step 48 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 48 [06/2020 - 08/2020]
- INSTALL CRANKSHAFT PULLEY ASSEMBLY
Refer to PROCEDURE - Step 49 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 49 [06/2020 - 08/2020]
- INSTALL VACUUM PUMP ASSEMBLY
Refer to PROCEDURE - Step 1
- CONNECT NO. 2 WATER BY-PASS HOSE (w/ Oil Cooler)
- Connect the No. 2 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure it.
- CONNECT NO. 1 WATER BY-PASS HOSE (w/ Oil Cooler)
- Connect the No. 1 water by-pass hose to the cylinder block sub-assembly and slide the clip to secure it.
- INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL PURGE VALVE (PURGE VSV)
- w/ Canister Pump Module:
Refer to PROCEDURE - Step 1
- w/o Canister Pump Module:
Refer to PROCEDURE - Step 1
- w/ Canister Pump Module:
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Refer to PROCEDURE - Step 4 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 4 [06/2020 - 08/2020]
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL INJECTOR SEAL
Refer to PROCEDURE - Step 1
- INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL DELIVERY PIPE
Refer to PROCEDURE - Step 3
- INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 1 [06/2020 - 08/2020]
- INSTALL NO. 5 ENGINE WIRE
Refer to PROCEDURE - Step 2 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 2 [06/2020 - 08/2020]
- INSTALL INJECTOR VIBRATION INSULATOR
Refer to PROCEDURE - Step 3 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 3 [06/2020 - 08/2020]
- INSTALL NO. 1 DELIVERY PIPE SPACER
Refer to PROCEDURE - Step 4 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 4 [06/2020 - 08/2020]
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 5 [06/2020 - 08/2020]
- INSTALL NO. 7 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 17 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 17 [06/2020 - 08/2020]
- TEMPORARILY INSTALL FUEL PUMP ASSEMBLY (for High Pressure)
Refer to PROCEDURE - Step 1
- TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL PUMP ASSEMBLY (for High Pressure)
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 21 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 21 [06/2020 - 08/2020]
- CONNECT FUEL TUBE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
Refer to PROCEDURE - Step 3
- INSTALL INTAKE MANIFOLD
Refer to PROCEDURE - Step 4
- INSTALL NO. 2 WATER BY-PASS PIPE
Refer to PROCEDURE - Step 25 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 25 [06/2020 - 08/2020]
- INSTALL NO. 3 WATER BY-PASS PIPE
Refer to PROCEDURE - Step 26 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 26 [06/2020 - 08/2020]
- INSTALL EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 27 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 27 [06/2020 - 08/2020]
- INSTALL NO. 4 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 28 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 28 [06/2020 - 08/2020]
- INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 29 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 29 [06/2020 - 08/2020]
- INSTALL NO. 1 EGR COOLER BRACKET
Refer to PROCEDURE - Step 30 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 30 [06/2020 - 08/2020]
- INSTALL EGR COOLER ASSEMBLY
Refer to PROCEDURE - Step 31 [11/2018 - 06/20209] , or refer to PROCEDURE - Step 31 [06/2020 - 08/2020]
- INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL EXHAUST MANIFOLD
Refer to PROCEDURE - Step 2
- INSTALL MANIFOLD STAY
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Refer to PROCEDURE - Step 35 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 35 [06/2020 - 08/2020]
- INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
Refer to PROCEDURE - Step 36 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 36 [06/2020 - 08/2020]
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 37 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 37 [06/2020 - 08/2020]
- INSTALL NO. 3 TIMING CHAIN COVER
Refer to PROCEDURE - Step 38 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 38 [06/2020 - 08/2020]
- INSTALL TIMING GEAR COVER INSULATOR
Refer to PROCEDURE - Step 39 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 39 [06/2020 - 08/2020]
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 41 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 41 [06/2020 - 08/2020]
- INSTALL NO. 2 ENGINE COVER
Refer to PROCEDURE - Step 42 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 42 [06/2020 - 08/2020]
- INSTALL COMPRESSOR ASSEMBLY WITH PULLEY
Refer to PROCEDURE - Step 43 [11/2018 - 06/2020] , or refer to PROCEDURE - Step 43 [06/2020 - 08/2020]
- INSTALL GENERATOR ASSEMBLY
- for 100 A, 130 A Type:
Refer to PROCEDURE - Step 1
- for 150 A Type:
Refer to PROCEDURE - Step 1
- for VALEO Made:
Refer to PROCEDURE - Step 1
- for 100 A, 130 A Type:
- INSTALL V-RIBBED BELT
Refer to PROCEDURE - Step 1
- INSTALL ENGINE HANGERS
See step 63[11/2018 - 10/2019], or refer to PROCEDURE - Step 63 [10/2019 - 08/2020]
- REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
Refer to INSTALLATION [11/2018 - 08/2020]