Installation [11/2018 - ]: Procedure
- INSTALL REAR STABILIZER BUSHING
- Install the 2 rear stabilizer bushings to the outside of the stoppers on the rear stabilizer bar.NOTE:
Be sure to install the rear stabilizer bushings so that each cutout faces the front of the vehicle.
*a Stopper *b Cutout HINT:
The cutout of the rear stabilizer bushing can be positioned either up or down.
- Install the 2 rear stabilizer bushings to the outside of the stoppers on the rear stabilizer bar.
- INSTALL REAR NO. 1 STABILIZER BAR BRACKET LH
- Install the rear No. 1 stabilizer bar bracket LH to the rear stabilizer bushing.
*a Arrow Mark *b Identification Mark Upper of the Vehicle NOTE:- Ensure that the identification mark faces the right side of the vehicle.
- Be sure to install the rear No. 1 stabilizer bar bracket LH so that each arrow mark faces the upper of the vehicle.
- Install the rear No. 1 stabilizer bar bracket LH to the rear stabilizer bushing.
- INSTALL REAR NO. 1 STABILIZER BAR BRACKET RH
HINT:
Perform the same procedure as for the LH side.
- INSTALL REAR LOWER STABILIZER BRACKET
- INSTALL REAR STABILIZER BAR
- Install the rear stabilizer bar, rear No. 1 stabilizer bar bracket LH, rear No. 1 stabilizer bar bracket RH, rear No. 2 stabilizer bar bracket LH, rear No. 2 stabilizer bar bracket RH and 2 rear stabilizer bushings to the rear suspension member sub-assembly with the 4 bolts.
Torque: 78 N.m (795 kgf/cm, 58 ft.lbf)
NOTE:- Ensure that the identification mark faces the right side of the vehicle.
- Temporarily tighten the bolt (A) and then fully tighten the 2 bolts in the order of (B) and (A).
*a Identification Mark
- Install the rear stabilizer bar, rear No. 1 stabilizer bar bracket LH, rear No. 1 stabilizer bar bracket RH, rear No. 2 stabilizer bar bracket LH, rear No. 2 stabilizer bar bracket RH and 2 rear stabilizer bushings to the rear suspension member sub-assembly with the 4 bolts.
- STABILIZE SUSPENSION
See step 4 [11/2018 - 02/2019], or see step 4 [02/2019 - 12/2021], or see step 4 [12/2021 - ]
- INSTALL REAR STABILIZER LINK ASSEMBLY LH
- Using a ball joint lock nut wrench, install the rear stabilizer link assembly LH with the nut (A).
Torque: 100 N.m (1020 kgf/cm, 74 ft.lbf)
*a Torque Wrench Fulcrum Length HINT:
- If the ball joint turns together with the nut, use a 6 mm hexagon socket wrench to hold the stud bolt.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Refer to PRECAUTION [11/2018 - ]
- When using a ball joint lock nut wrench (fulcrum length of 159 mm (6.260 in.)) + torque wrench (fulcrum length of 400 mm (15.748 in.)):
71.6 N.m (730 kgf/cm, 53 ft.lbf)
- Install the rear stabilizer link assembly LH with the bolt and nut (B).
Torque: 81 N.m (826 kgf/cm, 60 ft.lbf)
NOTE:Because the nut has its own stopper, do not turn the nut. Tighten the bolt with the nut secured.
- Using a ball joint lock nut wrench, install the rear stabilizer link assembly LH with the nut (A).
- INSTALL REAR STABILIZER LINK ASSEMBLY RH
HINT:
Perform the same procedure as for the LH side.
- INSTALL LOWER NO. 2 CONTROL ARM COVER LH (w/ Cover)
See step 9 [11/2018 - 02/2019], or see step 9 [02/2019 - 12/2021], or see step 9 [12/2021 - ]
- INSTALL LOWER NO. 2 CONTROL ARM COVER RH (w/ Cover)
HINT:
Perform the same procedure as for the LH side.
- INSTALL NO. 2 FLOOR UNDER COVER (for Gasoline Model)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 12
- INSTALL NO. 1 FLOOR UNDER COVER (for Gasoline Model)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 10
- INSTALL FRONT FLOOR COVER LH (for Gasoline Model)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 13
- INSTALL FRONT FLOOR COVER RH (for Gasoline Model)
w/ Floor Under Cover:
Refer to PROCEDURE - Step 11
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY (for Gasoline Model)
Refer to PROCEDURE - Step 99 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 99 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 99 [12/2021 - ]
- INSTALL NO. 1 ENGINE UNDER COVER (for Gasoline Model)
Refer to PROCEDURE - Step 100 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 100 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 100 [12/2021 - ]
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH (for Gasoline Model)
Refer to PROCEDURE - Step 101 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 101 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 101 [12/2021 - ]
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH (for Gasoline Model)
Refer to PROCEDURE - Step 102 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 102 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 102 [12/2021 - ]
- INSTALL MAIN MUFFLER HEAT INSULATOR
- Install the main muffler heat insulator to the vehicle body with the 4 nuts.
Torque: 4.9 N.m (50 kgf/cm, 43 in.lbf)
- Install the main muffler heat insulator to the vehicle body with the 4 nuts.
- INSTALL TAIL EXHAUST PIPE ASSEMBLY
- for HV Model:
Refer to INSTALLATION [11/2018 - 02/2019] , or refer to INSTALLATION [02/2019 - 08/2020] , or refer to INSTALLATION [08/2020 - ]
- for Gasoline Model:
Refer to INSTALLATION [11/2018 - 02/2019] , or refer to INSTALLATION [02/2019 - 08/2020] , or refer to INSTALLATION [08/2020 - ]
- for HV Model:
- INSTALL REAR WHEEL
Refer to INSTALLATION [11/2018 - ]
- INSPECT FOR EXHAUST GAS LEAK
- for HV Model:
Refer to PROCEDURE - Step 9 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 9 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 9 [08/2020 - ]
- for Gasoline Model:
Refer to PROCEDURE - Step 8 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 8 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 8 [08/2020 - ]
- for HV Model: