LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2020 >> Mirai >> Repair and Diagnosis (Single Page) >> Electrical >> Gauges >> Meter / Gauge System - Diagnostic Codes & Symptom Tests >> Meter / Gauge System >> Operating Light Control Rheostat does not Change Light Brightness [06/2015 - ] >> Procedure

Operating Light Control Rheostat does not Change Light Brightness [06/2015 - ]: Procedure

  1. READ VALUE USING TECHSTREAM (LIGHT CONTROL UP SWITCH, LIGHT CONTROL DOWN SWITCH) 
    1. Using the Techstream, read the Data List.

      Refer to DATA LIST / ACTIVE TEST [06/2015 - 01/2018] , or refer to DATA LIST / ACTIVE TEST [01/2018 - 11/2018] , or refer to DATA LIST / ACTIVE TEST [11/2018 - ]

      Body Electrical > Combination Meter > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      Light Control Up Switch Light control rheostat up switch OFF or ON OFF: Light control rheostat up switch released
      ON: Light control rheostat up switch pressed
      -
      Light Control Down Switch Light control rheostat down switch OFF or ON OFF: Light control rheostat down switch released
      ON: Light control rheostat down switch pressed
      -

      Body Electrical > Combination Meter > Data List 

      Tester Display
      Light Control Up Switch
      Light Control Down Switch

      OK

      Light control rheostat up or down switch condition displayed on the Techstream changes with the actual switch operation.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [06/2015 - 11/2018]  , or refer to  REMOVAL [11/2018 - ] 

    Result: 

    NG 

    See step  2

  2. INSPECT LIGHT CONTROL RHEOSTAT 
    1. Remove the light control rheostat.

      Refer to REMOVAL [06/2015 - ]

    2. Inspect the light control rheostat.

      Refer to INSPECTION [06/2015 - ]

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPLACE LIGHT CONTROL RHEOSTAT. Refer to  REMOVAL [06/2015 - ] 

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - LIGHT CONTROL RHEOSTAT) 
    1. Disconnect the G13 combination meter assembly connector.
    2. Disconnect the G12 light control rheostat.
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      G13-24 (TR) -G12-3 (UP) Always Below 1 Ω
      G13-25 (TC) -G12-2 (DOWN) Always Below 1 Ω
      G13-24 (TR) or G12-3 (UP) - Body ground Always 10 kΩ or higher
      G13-25 (SW3) or G12-2 (DOWN) - Body ground Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [06/2015 - 11/2018]  , or refer to  REMOVAL [11/2018 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR