DTC P107A-15: Fuel Rail Pressure Sensor (Low) / Fuel Rail Pressure Sensor "B" Circuit Short to Battery or Open [10/2022 - ]: Procedure
WARNING: This page is about a different car, the 2025 Toyota Highlander, 2024 Toyota Highlander, and 2023 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK HARNESS AND CONNECTOR
HINT:
Make sure that the connector is properly connected. If it is not, securely connect it and check for DTCs again.
- Disconnect the No. 2 fuel pressure sensor (for low pressure side) connector.
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 2 Fuel Pressure Sensor (for Low Pressure Side))Standard Voltage
Tester Connection Condition Specified Condition D11-1 (VC) - D11-3 (E2) Ignition switch ON 4.5 to 5.5 V D11-2 (PFL) - D11-3 (E2) Ignition switch ON 4.4 to 5.6 V - Turn the ignition switch off and wait for at least 30 seconds.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D11-3 (E2) - Body ground Ignition switch off Below 1 Ω D11-1 (VC) - D11-2 (PFL) Ignition switch off 171 to 189 kΩ HINT:
Perform "Inspection After Repair" after replacing the No. 2 fuel pressure sensor (for low pressure side).
Refer to INITIALIZATION [10/2022 - ]
Result
Proceed to OK NG
Result:
OK
REPLACE NO. 2 FUEL PRESSURE SENSOR (FOR LOW PRESSURE SIDE)
Refer to REMOVAL [10/2022 - 11/2023] , or refer to REMOVAL [11/2023 - ]
Result:
NG
See step 2
- CHECK HARNESS AND CONNECTOR (NO. 2 FUEL PRESSURE SENSOR (FOR LOW PRESSURE SIDE) - ECM)
- Disconnect the No. 2 fuel pressure sensor (for low pressure side) connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D11-3 (E2) - C88-120 (EPFL) Always Below 1 Ω D11-2 (PFL) - C88-121 (PFL) Always Below 1 Ω D11-2 (PFL) or C88-121 (PFL) - Other terminals Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE ECM
Refer to REMOVAL [10/2022 - 11/2023] , or refer to REMOVAL [11/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR