LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2020 >> Corolla L >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 76 (Automatic Transaxle System (K120) - Diagnostic Codes (5 Of 5) & Circuit Tests) >> K120 Continuously Variable Transaxle System >> ECU Power Source Circuit [06/2018 - 09/2022] >> Procedure

ECU Power Source Circuit [06/2018 - 09/2022]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. CHECK HARNESS AND CONNECTOR (TCM - BODY GROUND) 
    1. Disconnect the C80 TCM connector.
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      C80-2 (E1) - Body ground Always Below 1 Ω
    3. Connect the C80 TCM connector.

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  2

  2. INSPECT ECU TERMINAL VOLTAGE (+B TERMINAL) 
    1. Disconnect the C80 TCM connector.
    2. Turn the engine switch on (IG).
    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition
      C80-1 (+B) - Body ground Engine switch on (IG) 11 to 14 V
    4. Connect the C80 TCM connector.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    CHECK FOR INTERMITTENT PROBLEMS. Refer to  CHECK FOR INTERMITTENT PROBLEMS [06/2018 - 09/2024] 

    Result: 

    NG 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (TCM - NO. 1 INTEGRATION RELAY) 
    1. Disconnect the 1B No. 1 integration relay connector.
    2. Disconnect the C80 TCM connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)

      Tester Connection Condition Specified Condition
      C80-1 (+B) - 1B-4 Always Below 1 Ω
      C80-1 (+B) or 1B-4 - Body ground Always 10 kΩ or higher
    4. Connect the C80 TCM connector.
    5. Connect the 1B No. 1 integration relay connector.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    GO TO ECM POWER SOURCE CIRCUIT (ENGINE CONTROL SYSTEM / SFI SYSTEM). Refer to  ECM Power Source Circuit [06/2018 - 01/2019]  , or refer to  ECM Power Source Circuit [01/2019 - 09/2022] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR