Caution / Notice / Hint
WARNING: This page is about a different variant/trim than selected.
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EGR cooler assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
| Battery terminal is disconnected/reconnected | Perform steering sensor zero point calibration | Lane Control System (for Gasoline Model) | Refer to INITIALIZATION [06/2018 - 09/2022] |
| Pre-collision System (for Gasoline Model) | |||
| Lighting System (w/ AFS) (EXT) | |||
| Initialize back door lock*1 | Power Door Lock Control System (for Hatchback, Gasoline Model) | Refer to INITIALIZATION [06/2018 - 09/2022] | |
| Gas leaks from exhaust system is repaired | Inspection after repair |
|
Refer to INITIALIZATION [09/2019 - 04/2020] , or refer to INITIALIZATION [04/2020 - 11/2022] |
*1: for Hatchback
NOTE:
After the ignition switch is turned off, the radio and display receiver assembly records various types of memory and settings. As a result, after turning the ignition switch off, make sure to wait at least 85 seconds before disconnecting the cable from the negative (-) battery terminal. (for Navigation System and Audio and Visual System (for Gasoline Model))