Replacement [03/2023 - 09/2024]: Procedure
WARNING: This page is about a different variant/trim than selected.
- REMOVE NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 9
- REMOVE REAR ENGINE UNDER COVER LH
Refer to PROCEDURE - Step 10
- REPLACE CONTINUOUSLY VARIABLE TRANSAXLE FLUID
Refer to PROCEDURE - Step 3
- ADD SPECIFIED AMOUNT OF FLUID
See step 5
- ADJUST FLUID TEMPERATURE (when Using the Techstream)
See step 6
- ADJUST FLUID TEMPERATURE (when Not Using the Techstream)
See step 7
- ADJUST FLUID LEVEL
See step 8
- PERFORM FLUID THERMAL DEGRADATION ESTIMATE RESET NOTE:
If approximately 50% or more of the CVT fluid has been replaced during a repair of the transaxle or a similar operation, perform ATF Thermal Degradation Estimate Reset.
- for K120:
Refer to INITIALIZATION [11/2022 - 09/2024]
- for K121:
Refer to INITIALIZATION [03/2023 - ]
- for K120:
- REBUILD WORK
See step 10
- INSTALL REAR ENGINE UNDER COVER LH
Refer to PROCEDURE - Step 67
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 69