Installation [08/2020 - ]: Procedure
WARNING: This page is about a different car, the 2021 Toyota Avalon. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY
- Apply a small amount of engine oil to the O-ring of the oil pressure control valve assembly.
*a O-ring - Using an 8 mm socket wrench, install the oil pressure control valve assembly to the timing chain cover assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- When reusing the oil pressure control valve assembly, inspect the O-ring.
- Make sure that the O-ring is not cracked or does not move out of place during installation.
- Connect the oil pressure control valve assembly connector.
- Apply a small amount of engine oil to the O-ring of the oil pressure control valve assembly.
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6
- INSTALL FRONT FENDER APRON SEAL RH
Refer to PROCEDURE - Step 69