Installation [08/2016 - ]: Procedure
- INSTALL PARK/NEUTRAL POSITION SWITCH
- Move the shift lever to N.
- Temporarily install the park/neutral position switch to the automatic transaxle case sub-assembly with the 2 bolts.NOTE:
Before installing the park/neutral position switch, remove any dirt or rust on the manual valve lever shaft sub-assembly. Be sure to install the park/neutral position switch straight along the manual valve lever shaft sub-assembly while being careful not to deform the plate spring that supports the manual valve lever shaft sub-assembly. If the plate spring is deformed, the park/neutral position switch cannot be installed correctly.
- Temporarily install the transmission control shaft lever to the park/neutral position switch.
- Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
*a P Position *b N Position - Remove the transmission control shaft lever from the park/neutral position switch.
- Align the protrusion with the neutral basic line.
*a Neutral Basic Line *b Protrusion - Hold the park/neutral position switch in that position and tighten the 2 bolts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the washer and nut.
Torque: 12.7 N*m (130 kgf*cm, 9 ft.*lbf)
- Connect the park/neutral position switch connector.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Connect the transmission control cable assembly to the transmission control shaft lever.NOTE:
Before connecting the transmission control cable assembly, check that the park/neutral position switch and shift lever are in neutral.
- Connect the transmission control cable assembly to the transmission control shaft lever.
- INSTALL AIR CLEANER BRACKET
Refer to PROCEDURE - Step 63
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 64
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 65
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 3
- INSTALL AIR CLEANER INLET ASSEMBLY
Refer to PROCEDURE - Step 67
- INSTALL BATTERY
Refer to PROCEDURE - Step 68
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2016 - 11/2017] Refer to INITIALIZATION [11/2017 - ]
- INSPECT PARK/NEUTRAL POSITION SWITCH OPERATION
See step 1
- INSPECT SHIFT LEVER POSITION
See step 1
- ADJUST SHIFT LEVER POSITION
See step 1