Installation [12/2015 - ]: Procedure

  1. INSTALL FRONT STABILIZER BAR 
    1. Install the front stabilizer bar from the left side of the vehicle.
  2. INSTALL FRONT NO. 1 STABILIZER BAR BUSHING 
    1. Install the 2 front No. 1 stabilizer bar bushings to the front stabilizer bar as shown in the illustration.
      GTY705416Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *a Cutout
      *b Front of the Vehicle
      *c Inside of the Vehicle
      NOTE:

      When installing the front No. 1 stabilizer bar bushings, make sure that the cutout faces the rear of the vehicle.

  3. INSTALL FRONT NO. 2 STABILIZER BRACKET LH 
    1. Install the front No. 2 stabilizer bracket LH to the front No. 1 stabilizer bar bushing.
  4. INSTALL FRONT NO. 2 STABILIZER BRACKET RH 

    HINT: 

    Perform the same procedure as the LH side.

  5. INSTALL FRONT NO. 1 STABILIZER BRACKET LH 
    1. Install the front No. 1 stabilizer bracket LH to the front frame assembly with the 2 bolts.

      Torque: 33 N*m (337 kgf*cm, 24 ft.*lbf) 

  6. INSTALL FRONT NO. 1 STABILIZER BRACKET RH 

    HINT: 

    Perform the same procedure as the LH side.

  7. INSTALL FRONT STABILIZER LINK ASSEMBLY LH 
    1. Install the front stabilizer link assembly LH with the 2 nuts.

      for Upper Side 

      Torque: 130 N*m (1326 kgf*cm, 96 ft.*lbf) 

      for Lower Side 

      Torque: 74 N*m (755 kgf*cm, 55 ft.*lbf) 

      HINT: 

      If the ball joint turns together with the nut, use a hexagon wrench (6 mm) to hold the stud bolt.

  8. INSTALL FRONT STABILIZER LINK ASSEMBLY RH 

    HINT: 

    Perform the same procedure as the LH side.

  9. INSTALL FRONT EXHAUST PIPE ASSEMBLY 

    Refer to PROCEDURE - Step 3 [12/2015 - 08/2016] , or refer to PROCEDURE - Step 3 [08/2016 - ]

  10. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET 

    Refer to PROCEDURE - Step 40 [12/2015 - 08/2016] , or refer to PROCEDURE - Step 43 [08/2016 - ]

  11. INSTALL EXHAUST MANIFOLD TO HEAD GASKET 

    (Refer to INSTALLATION [12/2015 - 08/2016] , or refer to INSTALLATION [08/2016 - ] )

  12. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH 

    (Refer to INSTALLATION [12/2015 - 08/2016] , or refer to INSTALLATION [08/2016 - ] )