Adjustment [08/2016 - ]: Procedure
- PRECAUTION NOTE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.
Refer to PRECAUTION [08/2016 - ]
- DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2016 - 11/2017] Refer to INITIALIZATION [11/2017 - ]
- REMOVE BATTERY
Refer to PROCEDURE - Step 19
- REMOVE AIR CLEANER INLET ASSEMBLY
Refer to PROCEDURE - Step 20
- REMOVE AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 4
- REMOVE AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 22
- REMOVE AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 23
- DISCONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
See step 9
- ADJUST PARK/NEUTRAL POSITION SWITCH
- Disconnect the park/neutral position switch connector.
- Remove the nut and transmission control shaft lever from the manual valve lever shaft sub-assembly.
- Loosen the 2 bolts of the park/neutral position switch.
- Align the protrusion with the neutral basic line.
*a Neutral Basic Line *b Protrusion - Hold the park/neutral position switch in position and tighten the 2 bolts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the nut.
Torque: 12.7 N*m (130 kgf*cm, 9 ft.*lbf)
- Connect the park/neutral position switch connector.
- Disconnect the park/neutral position switch connector.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
See step 2
- INSPECT PARK/NEUTRAL POSITION SWITCH OPERATION
See step 1
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 64
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 65
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 3
- INSTALL AIR CLEANER INLET ASSEMBLY
Refer to PROCEDURE - Step 67
- INSTALL BATTERY
Refer to PROCEDURE - Step 68
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2016 - 11/2017] Refer to INITIALIZATION [11/2017 - ]