Installation [08/2016 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp stay with the bolt.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Connect the wire harness clamp.
- Type A:
- Install the generator assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Temporarily install the generator assembly bracket with the 2 bolts.
- Fully tighten the 2 bolts.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Install the generator assembly with the 2 bolts.
- Type B:
- Install the generator assembly bracket to the generator assembly with the bolt.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Install the generator assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Install the nut.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Install the generator assembly bracket to the generator assembly with the bolt.
- Install the generator wire with the nut.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Install the terminal cap.
- Connect the 2 wire harness clamps.
- Connect the compressor and magnetic clutch connector.
- Install the wire harness clamp stay with the bolt.
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- Install a new engine oil level dipstick guide O-ring to the engine oil level dipstick guide.
- Apply a light coat of engine oil to the engine oil level dipstick guide O-ring.
- Insert the engine oil level dipstick guide end into the oil pan sub-assembly.
- Using a 17 mm union nut wrench, install the engine oil level dipstick guide to the camshaft housing sub-assembly LH with the bolt.
Specified tightening torque
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Refer to PRECAUTION [08/2016 - ]
- When using 12 mm union nut wrench (fulcrum length of 20 mm (0.79 in.)) + torque wrench (fulcrum length of 162mm (6.38 in.)):
18.7 N*m (191 kgf*cm, 14 ft.*lbf)
*a Torque Wrench Fulcrum Length - Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1
- INSTALL RADIATOR ASSEMBLY WITH FAN SHROUD AND FAN MOTOR
Refer to INSTALLATION [08/2016 - 11/2017] , or refer to INSTALLATION [11/2017 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2016 - 11/2017] , or refer to INITIALIZATION [11/2017 - ]