LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2019 >> RAV4 XLE, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 28 (Emission Control System (A25A-FXS) - Service Information) >> EGR Cooler >> Installation [11/2018 - 02/2019] >> Procedure

Installation [11/2018 - 02/2019]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL EGR COOLER ASSEMBLY 
    1. Install a new EGR cooler gasket to the EGR cooler assembly.
      GTY746055Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Claw
      NOTE:

      Make sure that the claws of the EGR cooler gasket are toward the EGR cooler assembly side.

    2. Install a new EGR valve gasket to the EGR valve assembly.
      GTY741636Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Claw
      NOTE:

      Make sure that the claws of the EGR valve gasket are toward the EGR valve assembly side.

    3. Temporarily install the EGR cooler assembly to the cylinder head sub-assembly and EGR valve assembly with the 5 bolts.
      GTY769009Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Tighten the 3 bolts (A).

      Torque: 24 N.m (245 kgf/cm, 18 ft.lbf) 

    5. Tighten the 2 bolts (B).

      Torque: 24 N.m (245 kgf/cm, 18 ft.lbf) 

    6. Connect the No. 3 water by-pass hose and No. 4 water by-pass hose to the EGR cooler assembly and slide the 2 clips to secure them.
  2. INSTALL INVERTER WITH CONVERTER ASSEMBLY 

    Refer to INSTALLATION [11/2018 - 08/2020]

  3. ADD ENGINE COOLANT (for Engine) 

    Refer to PROCEDURE - Step 2

  4. INSPECT FOR COOLANT LEAK (for Engine) 

    Refer to PROCEDURE - Step 1

  5. INSPECT FOR EXHAUST GAS LEAK 

    Refer to PROCEDURE - Step 9