Caution / Notice / Hint
WARNING: This page is about a different variant/trim than selected.
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during water inlet with thermostat sub-assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedures are not Performed | Link |
|---|---|---|---|
|
Inspection after repair |
|
Refer to INITIALIZATION [12/2021 - 11/2024] |
NOTE:
- After the ignition switch is turned off, the radio and display receiver assembly records various types of memory and settings. As a result, after turning the ignition switch off, be sure to wait for the time specified in the following table before disconnecting the cable from the negative (-) auxiliary battery terminal.WAITING TIME BEFORE DISCONNECTING CABLE FROM NEGATIVE (-) AUXILIARY BATTERY TERMINAL
System Name See Procedure Vehicle enrolled in Toyota Audio Multimedia system or safety connect system 6 minutes Vehicle not enrolled in Toyota Audio Multimedia system and safety connect system 1 minute - This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Refer to PRECAUTION [11/2018 - ]