Installation [12/2013 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL GENERATOR ASSEMBLY
- Install the generator assembly with the 2 bolts.
Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the wire harness clamp bracket with the bolt.
Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf)
- Connect the generator assembly connector.
- Connect the wire harness to terminal B and install the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Close the terminal cap.
- Install the generator assembly with the 2 bolts.
- INSTALL V-RIBBED BELT
Refer to INSTALLATION [12/2013 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [12/2013 - 11/2016] Refer to INITIALIZATION [11/2016 - ]