Installation [12/2013 - 11/2016]: Procedure
WARNING: This page is about a different car, the 2016 Toyota Highlander, 2015 Toyota Highlander, and 2014 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
- Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
Adhesive
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
*a Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent - Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover LH sub-assembly.
Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf)
NOTE:Do not start the engine for at least 1 hour after installation.
- Install the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
- Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 84