Shift Paddle Switch Circuit [10/2015 - ]: Procedure
- INSPECT SHIFT PADDLE SWITCH (TRANSMISSION SHIFT SWITCH ASSEMBLY)
- Disconnect the ECM connector.
*a Front view of wire harness connector
(to ECM) - Disconnect the G36 transmission control switch connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A62-42 (SFTU) - Body ground "+" shift paddle operated and held (up-shift) Below 2.5 Ω A62-43 (SFTD) - Body ground "-" shift paddle operated and held (down-shift) Below 2.5 Ω A62-42 (SFTU) - Body ground "+" shift paddle not operated (up-shift) 1 MΩ or higher A62-43 (SFTD) - Body ground "-" shift paddle not operated (down-shift) 1 MΩ or higher
Result:
OK
GO TO TRANSMISSION CONTROL SWITCH CIRCUIT: Transmission Control Switch Circuit [10/2015 - ]
Result:
NG
See step 2
- Disconnect the ECM connector.
- CHECK HARNESS AND CONNECTOR (SPIRAL CABLE SUB-ASSEMBLY - BODY GROUND)
- Disconnect the spiral cable sub-assembly connector.
*a Front view of wire harness connector
(to Spiral Cable Sub-assembly)Refer to REMOVAL [12/2012 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G8-2 (ECC) - Body ground Always Below 1 Ω
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 3
- Disconnect the spiral cable sub-assembly connector.
- CHECK HARNESS AND CONNECTOR (SPIRAL CABLE SUB-ASSEMBLY - ECM)
- Disconnect the G8 spiral cable sub-assembly connector.
Refer to REMOVAL [12/2012 - ]
- Disconnect the A62 ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G8-7 (SDN) - A62-43 (SFTD) Always Below 1 Ω G8-14 (SUP) - A62-42 (SFTU) Always Below 1 Ω G8-7 (SDN) or A62-43 (SFTD) - Body ground Always 10 kΩ or higher G8-14 (SUP) or A62-42 (SFTU) - Body ground Always 10 kΩ or higher
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- Disconnect the G8 spiral cable sub-assembly connector.
- CHECK HARNESS AND CONNECTOR (SPIRAL CABLE SUB-ASSEMBLY - SHIFT PADDLE SWITCH)
- Disconnect the steering pad switch connector.
*a Steering Pad Switch Assembly Connector
(to Spiral Cable Sub-assembly)Refer to REMOVAL [10/2015 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition z1-6 (SUP) - z1-7 (ECC) "+" shift paddle operated and held (up-shift) Below 2.5 Ω z1-12 (SDN) - z1-7 (ECC) "-" shift paddle operated and held (down-shift) Below 2.5 Ω z1-6 (SUP) - z1-7 (ECC) "+" shift paddle not operated (up-shift) 1 MΩ or higher z1-12 (SDN) - z1-7 (ECC) "-" shift paddle not operated (down-shift) 1 MΩ or higher
Result:
NG
See step 6
Result:
OK
See step 5
- Disconnect the steering pad switch connector.
- INSPECT SPIRAL CABLE SUB-ASSEMBLY
- Inspect the spiral cable sub-assembly.
Refer to INSPECTION [10/2015 - ]
Result:
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE: PROBLEM SYMPTOMS TABLE [10/2015 - ]
Result:
NG
REPLACE SPIRAL CABLE SUB-ASSEMBLY: REMOVAL [12/2012 - ]
- Inspect the spiral cable sub-assembly.
- INSPECT SHIFT PADDLE SWITCH LH (TRANSMISSION SHIFT SWITCH ASSEMBLY)
- Remove the shift paddle switch LH.
*1 Shift Paddle Switch LH Refer to REMOVAL [10/2015 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition SFTD - ECC "-" shift paddle operated and held (down-shift) Below 2.5 Ω SFTD - ECC1 "-" shift paddle operated and held (down-shift) Below 2.5 Ω SFTD - ECC "-" shift paddle not operated (down-shift) 1 MΩ or higher SFTD - ECC1 "-" shift paddle not operated (down-shift) 1 MΩ or higher
Result:
NG
REPLACE SHIFT PADDLE SWITCH LH (TRANSMISSION SHIFT SWITCH ASSEMBLY): REMOVAL [10/2015 - ]
Result:
OK
See step 7
- Remove the shift paddle switch LH.
- INSPECT SHIFT PADDLE SWITCH RH (TRANSMISSION SHIFT SWITCH ASSEMBLY)
- Remove the shift paddle switch RH.
*1 Shift Paddle Switch RH Refer to REMOVAL [10/2015 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition SFTU - ECC1 "+" shift paddle operated and held (up-shift) Below 2.5 Ω SFTU - ECC1 "+" shift paddle not operated (up-shift) 1 MΩ or higher
Result:
NG
REPLACE SHIFT PADDLE SWITCH RH (TRANSMISSION SHIFT SWITCH ASSEMBLY): REMOVAL [10/2015 - ]
Result:
OK
See step 8
- Remove the shift paddle switch RH.
- INSPECT NO. 1 SWITCH WIRE
- Disconnect the No. 1 switch wire connector.
*a Front view of wire harness connector
(to Steering Pad Switch Assembly)Refer to REMOVAL [10/2015 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition z5-2 (SFTU) - z5-7 (ECC) "+" shift paddle operated and held (up-shift) Below 2.5 Ω z5-3 (SFTD) - z5-7 (ECC) "-" shift paddle operated and held (down-shift) Below 2.5 Ω z5-2 (SFTU) - z5-7 (ECC) "+" shift paddle not operated (up-shift) 1 MΩ or higher z5-3 (SFTD) - z5-7 (ECC) "-" shift paddle not operated (down-shift) 1 MΩ or higher
Result:
OK
REPLACE STEERING PAD SWITCH ASSEMBLY: REMOVAL [10/2015 - ]
Result:
NG
REPLACE NO. 1 SWITCH WIRE: REMOVAL [10/2015 - ]
- Disconnect the No. 1 switch wire connector.