Installation [11/2015 - ]: Procedure
- INSTALL HYBRID VEHICLE CONTROL ECU
- INSTALL ECU INTEGRATION BOX RH
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
Refer to PROCEDURE - Step 10 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 10 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 10 [08/2019 -]
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 11 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 11 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 11 [08/2019 -]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [11/2015 - 11/2017] , or refer to INITIALIZATION [11/2017 - 12/2018] , or refer to INITIALIZATION [12/2018 - 08/2019] , or refer to INITIALIZATION [08/2019 - 07/2020] , or refer to INITIALIZATION [07/2020 - ]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [11/2015 - 11/2017] , or refer to INITIALIZATION [11/2017 - 12/2018] , or refer to INITIALIZATION [12/2018 - 08/2019] , or refer to INITIALIZATION [08/2019 - 07/2020] , or refer to INITIALIZATION [07/2020 - ]