Installation [11/2016 - ]: Procedure
- INSTALL STARTER ASSEMBLY
- Type B:
- Type A:
- Install the starter assembly with the 2 bolts.
Torque: 37 N*m (377 kgf*cm, 27 ft.*lbf)
- Install the starter assembly with the 2 bolts.
- Connect terminal 30 with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Close the terminal cap.
- Connect the starter assembly connector.
- INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 62
- INSTALL INLET AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 63
- INSTALL BATTERY
Refer to PROCEDURE - Step 64
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 91
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 4
- INSTALL RADIATOR SIDE SEAL RH
Refer to PROCEDURE - Step 5
- INSTALL RADIATOR SIDE DEFLECTOR SEAL LH
Refer to PROCEDURE - Step 6
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [11/2016 - ]