Installation [11/2016 - ]: Procedure
- INSTALL OIL COOLER ASSEMBLY
- Install the No. 1 cylinder block insulator and 2 new O-rings to the No. 1 oil cooler bracket.
- Install the oil cooler assembly to the No. 1 oil cooler bracket with the 2 bolts and 2 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the oil cooler assembly, and slide the 2 clips to secure them.
- Install the hose clamp with the nut to the cylinder block sub-assembly.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- INSTALL EXHAUST MANIFOLD ASSEMBLY LH
Refer to INSTALLATION [11/2016 - ]
- ADD ENGINE OIL
See step 4
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1
- INSPECT FOR OIL LEAK
See step 5
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 2
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 3