Removal [11/2016 - ]: Procedure
- DRAIN ENGINE COOLANT
See step 1
- REMOVE V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 25
- REMOVE NO. 2 ENGINE MOUNTING STAY RH
Refer to PROCEDURE - Step 14
- REMOVE ENGINE MOVING CONTROL ROD BRACKET
Refer to PROCEDURE - Step 33
- DISCONNECT ENGINE WIRE
- REMOVE FRONT NO. 1 ENGINE MOUNTING BRACKET LH
- DISCONNECT NO. 2 RADIATOR HOSE
Refer to PROCEDURE - Step 38
- DISCONNECT WATER BY-PASS HOSE
- REMOVE WATER INLET WITH THERMOSTAT SUB-ASSEMBLY