LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2018 >> Highlander XLE, FWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery / Charging System (2GR-FKS) (Service Information) (Except Hybrid) >> Generator >> Installation [11/2016 - ] >> Procedure

Installation [11/2016 - ]: Procedure

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the wire harness clamp bracket with the bolt.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

    2. Type A:
      1. Install the generator assembly with the 2 bolts.

        Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

      2. Temporarily install the generator assembly bracket with the 2 bolts.
      3. Fully tighten the 2 bolts.

        Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    3. Type B:
      1. Install the generator assembly bracket to the generator assembly with the bolt.

        Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

        GTY691470Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      2. Install the generator assembly with the 2 bolts.

        Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

      3. Install the nut.

        Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    4. Engage the 2 wire harness clamps.
    5. Connect the magnetic clutch connector.
    6. Connect the generator assembly connector.
    7. Connect the wire harness to terminal B with the nut.

      Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

    8. Close the terminal cap.
  2. INSTALL V-RIBBED BELT 

    Refer to INSTALLATION [11/2016 - ]

  3. INSTALL FAN SHROUD 

    Refer to INSTALLATION [11/2016 - ]

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [11/2016 - ]