LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2018 >> Camry LE >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission System (UB80E) - Service Information (2 Of 3) (Except Hybrid) >> Transmission Control Cable >> Installation [03/2017 - ] >> Procedure

Installation [03/2017 - ]: Procedure

  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Pass the transmission control cable assembly into the vehicle and install the transmission control cable assembly to the vehicle body with the 2 nuts.

      Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

    2. Connect the transmission control cable assembly to the vehicle body with the 2 nuts.

      Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

    3. Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
    4. Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.
      GTY753628Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Correct
      *b Incorrect
      NOTE:

      Before installing the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.

  2. INSTALL NO. 1 CONSOLE BOX DUCT (for Dual Type) 
    1. Install the No. 1 console box duct.
  3. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY 

    Refer to INSTALLATION [03/2017 - ] 

  4. INSTALL FRONT LOWER NO. 1 FLOOR HEAT INSULATOR 
    1. Install the front lower No. 1 floor heat insulator to the vehicle body with the 2 nuts.

      Torque: 4.9 N.m (50 kgf/cm, 43 in.lbf) 

  5. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst) 

    Refer to INSTALLATION [03/2017 - 06/2017] , or refer to INSTALLATION [06/2017 - 03/2020] , or refer to INSTALLATION [03/2020 - ]

  6. INSTALL BATTERY CLAMP SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 41 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 41 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 41 [08/2018 - 03/2020] , or refer to PROCEDURE - Step 45 [03/2020 - 10/2020] , or refer to PROCEDURE - Step 45 [10/2020 - ]

  7. INSTALL ECM 

    Refer to INSTALLATION [03/2017 - ]

  8. INSTALL BATTERY 

    Refer to INSTALLATION [03/2017 - 08/2018] , or refer to INSTALLATION [08/2018 - ]

  9. INSPECT SHIFT LEVER POSITION 

    See step  2

  10. ADJUST SHIFT LEVER POSITION 

    Refer to ADJUSTMENT [03/2017 - ]