Caution / Notice / Hint
WARNING: This page is about a different variant/trim than selected.
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel injector assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
| Battery terminal is disconnected/reconnected | Perform steering sensor zero point calibration | Lane Tracing Assist System | Refer to INITIALIZATION [10/2020 - ] |
| Pre-collision system | |||
| Parking Support Brake System*1 | |||
| Memorize steering angle neutral point | Parking assist monitor system | Refer to INITIALIZATION [03/2017 - ] | |
| Panoramic view monitor system | Refer to INITIALIZATION [10/2020 - ] | ||
|
Inspection after repair |
|
Refer to INITIALIZATION [09/2019 - ] |
*1: When performing learning using the Techstream.