Installation [06/2016 - ]: Procedure
- INSTALL LIGHT CONTROL RHEOSTAT
- Engage the 2 claws to install the light control rheostat.
- INSTALL SWITCH BASE
- Engage the 4 claws to install the switch base.
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
- Connect each connector.
- Engage the 4 claws.
- Engage the 4 clips to install the No. 1 instrument panel under cover sub-assembly.
- Install the 2 screws.
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 8 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 8 [03/2017 - ]