Installation [11/2015 - ]: Procedure

  1. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY 
    1. Check that the power switch is off.
    2. Check that the cable is disconnected from the negative (-) auxiliary battery terminal.
      WARNING:

      Wait at least 90 seconds after disconnecting the cable from the negative (-) auxiliary battery terminal to disable the SRS system.

      GTY581108Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the airbag connector to the lower No. 1 instrument panel airbag assembly.
      GTY539498Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Airbag Connector
      *b Airbag Connector Lock
      NOTE:

      When connecting any airbag connector, take care not to damage the airbag wire harness.

    4. Push in the airbag connector lock to install the airbag connector.
    5. Engage the 4 claws and hook to temporarily install the lower No. 1 instrument panel airbag assembly.
    6. Install the lower No. 1 instrument panel airbag assembly with the 2 bolts.

      Torque: 10 N.m (102 kgf.cm, 7 ft./lbf) 

      NOTE:

      Confirm that the lower No. 1 instrument panel airbag assembly is installed securely without any excessive gaps and is not protruding outward.

  2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 20 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 22 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 21 [08/2019 - ]

  3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 21 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 23 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 22 [08/2019 - ]

  4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 22 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 24 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 23 [08/2019 - ]

  5. INSTALL COWL SIDE TRIM BOARD LH 

    Refer to PROCEDURE - Step 50 [11/2015 - 12/2018] , or refer to PROCEDURE - Step 46 [12/2018 - 07/2020] , or refer to PROCEDURE - Step 46 [07/2020 - ]

  6. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 51 [11/2015 - 12/2018] , or refer to PROCEDURE - Step 47 [12/2018 - 07/2020] , or refer to PROCEDURE - Step 47 [07/2020 - ]

  7. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY 

    Refer to PROCEDURE - Step 25 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 27 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 26 [08/2019 - ]

  8. INSTALL INSTRUMENT PANEL FINISH PANEL END LH 

    Refer to PROCEDURE - Step 26 [11/2015 - 11/2017] , or refer to PROCEDURE - Step 28 [11/2017 - 08/2019] , or refer to PROCEDURE - Step 27 [08/2019 - ]

  9. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [11/2015 - 11/2017] , or refer to INITIALIZATION [11/2017 - 12/2018] , or refer to INITIALIZATION [12/2018 - 08/2019] , or refer to INITIALIZATION [08/2019 - 07/2020] , or refer to INITIALIZATION [07/2020 - ]

  10. PERFORM DIAGNOSTIC SYSTEM CHECK 

    Refer to DTC CHECK / CLEAR [11/2015 - 12/2018] , or refer to DTC CHECK / CLEAR [12/2018 - 08/2019] , or refer to DTC CHECK / CLEAR [08/2019 - ]

  11. INSPECT SRS WARNING LIGHT 

    Refer to DIAGNOSIS SYSTEM [11/2015 - 08/2016] , or refer to DIAGNOSIS SYSTEM [08/2016 - 08/2019] , or refer to OPERATION CHECK [08/2019 - 07/2020] , or refer to OPERATION CHECK [07/2020 - ]