LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2017 >> Prius C Two >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display (Service Information) >> Light Control Rheostat >> Installation [11/2015 - ] >> Procedure

Installation [11/2015 - ]: Procedure

  1. INSTALL LIGHT CONTROL RHEOSTAT 
    1. Engage the 2 claws to install the light control rheostat.
  2. INSTALL NO. 1 SWITCH HOLE BASE 

    Refer to PROCEDURE - Step 25 and Refer to PROCEDURE - Step 25

  3. INSTALL UPPER INSTRUMENT PANEL ASSEMBLY 

    (Refer to INSTALLATION [11/2015 - 06/2017] and Refer to INSTALLATION [06/2017 - ] )