Installation [11/2015 - ]: Procedure
- INSTALL LIGHT CONTROL RHEOSTAT
- Engage the 2 claws to install the light control rheostat.
- INSTALL NO. 1 SWITCH HOLE BASE
Refer to PROCEDURE - Step 25 and Refer to PROCEDURE - Step 25
- INSTALL UPPER INSTRUMENT PANEL ASSEMBLY
(Refer to INSTALLATION [11/2015 - 06/2017] and Refer to INSTALLATION [06/2017 - ] )