Fuel Injector Circuit [02/2014 - 11/2016]: Procedure
- CHECK TERMINAL VOLTAGE (POWER SOURCE OF FUEL INJECTOR ASSEMBLY)
*a Front view of wire harness connector
(to Fuel Injector Assembly)- Disconnect the fuel injector assembly connector.
- Turn the power switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition C24-2 - Body ground Power switch on (IG) 11 to 14 V C26-2 - Body ground Power switch on (IG) 11 to 14 V C27-2 - Body ground Power switch on (IG) 11 to 14 V C29-2 - Body ground Power switch on (IG) 11 to 14 V C30-2 - Body ground Power switch on (IG) 11 to 14 V C31-2 - Body ground Power switch on (IG) 11 to 14 V Result
Proceed to OK NG
Result: 2
NG
See step 4
Result: 1
OK
See step 2
- INSPECT FUEL INJECTOR ASSEMBLY
- Inspect the fuel injector assembly.
Refer to INSPECTION [02/2014 - 11/2016]
HINT:
Perform "Inspection After Repair" after replacing the fuel injector assembly.
Refer to INITIALIZATION [02/2014 - 11/2016]
Result
Proceed to OK NG
Result: 2
NG
REPLACE FUEL INJECTOR ASSEMBLY. Refer to REMOVAL [02/2014 - 11/2016]
Result: 1
OK
See step 3
- Inspect the fuel injector assembly.
- CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM)
- Disconnect the fuel injector assembly connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C24-1 - C1-19 (#10) Always Below 1 Ω C26-1 - C1-20 (#20) Always Below 1 Ω C27-1 - C1-53 (#30) Always Below 1 Ω C29-1 - C1-49 (#40) Always Below 1 Ω C30-1 - C1-21 (#50) Always Below 1 Ω C31-1 - C1-52 (#60) Always Below 1 Ω C24-1 or C1-19 (#10) - Body ground Always 10 kΩ or higher C26-1 or C1-20 (#20) - Body ground Always 10 kΩ or higher C27-1 or C1-53 (#30) - Body ground Always 10 kΩ or higher C29-1 or C1-49 (#40) - Body ground Always 10 kΩ or higher C30-1 or C1-21 (#50) - Body ground Always 10 kΩ or higher C31-1 or C1-52 (#60) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result: 1
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [02/2014 - 11/2016]
Result: 2
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU - FUEL INJECTOR ASSEMBLY)
- Disconnect the fuel injector assembly connector.
- Disconnect the semiconductor pwr integration ECU connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1G-3 - C24-2 Always Below 1 Ω 1G-3 - C26-2 Always Below 1 Ω 1G-3 - C27-2 Always Below 1 Ω 1G-3 - C29-2 Always Below 1 Ω 1G-3 - C30-2 Always Below 1 Ω 1G-3 - C31-2 Always Below 1 Ω 1G-3 or C24-2 - Body ground Always 10 kΩ or higher 1G-3 or C26-2 - Body ground Always 10 kΩ or higher 1G-3 or C27-2 - Body ground Always 10 kΩ or higher 1G-3 or C29-2 - Body ground Always 10 kΩ or higher 1G-3 or C30-2 - Body ground Always 10 kΩ or higher 1G-3 or C31-2 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result: 2
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result: 1
OK
See step 5
- INSPECT SEMICONDUCTOR PWR INTEGRATION ECU
- Inspect the semiconductor pwr integration ECU (IG2 relay).
Refer to INSPECTION [02/2014 - ]
Result
Proceed to OK NG
Result: 1
OK
GO TO ECM POWER SOURCE CIRCUIT. Refer to ECM Power Source Circuit [02/2014 - 11/2016]
Result: 2
NG
REPLACE SEMICONDUCTOR PWR INTEGRATION ECU. Refer to REMOVAL [02/2014 - ]
- Inspect the semiconductor pwr integration ECU (IG2 relay).