LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2017 >> Highlander LE Plus, AWD >> Repair and Diagnosis >> Suspension >> Front Suspension >> Front Suspension (Service Information) (Except Hybrid) >> FRONT STABILIZER BAR (for 2WD) >> Installation [12/2013 - 11/2016] >> Procedure

Installation [12/2013 - 11/2016]: Procedure

  1. INSTALL FRONT NO. 1 STABILIZER BAR BUSHING 
    1. Install the 2 front No. 1 stabilizer bar bushings to the front stabilizer bar as shown in the illustration.
      GTY450865Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Cutout
      Front of the Vehicle
      Inside of the Vehicle
      NOTE:

      When installing the front No. 1 stabilizer bar bushings, make sure that the cutout is facing the rear of the vehicle.

  2. INSTALL FRONT STABILIZER BAR 
    1. Install the front stabilizer bar with 2 front No. 1 stabilizer bar bushings to the vehicle.
  3. INSTALL STEERING LINK ASSEMBLY 

    Refer to PROCEDURE - Step 3

  4. INSTALL FRONT NO. 2 STABILIZER BRACKET LH 
    1. Install the front No. 2 stabilizer bracket LH to the front No. 1 stabilizer bar bushing.
  5. INSTALL FRONT NO. 2 STABILIZER BRACKET RH 

    HINT: 

    Perform the same procedure as for the LH side.

  6. INSTALL FRONT STABILIZER BAR 

    Refer to PROCEDURE - Step 6

  7. INSTALL FRONT NO. 1 STABILIZER BRACKET LH 
    1. Install the front No. 1 stabilizer bracket LH to the front frame assembly with the 2 bolts.

      Torque: 29 N*m (296 kgf*cm, 21 ft.*lbf) 

  8. INSTALL FRONT NO. 1 STABILIZER BRACKET RH 

    HINT: 

    Perform the same procedure as for the LH side.

  9. INSTALL FRONT STABILIZER LINK ASSEMBLY LH 
    1. Install the front stabilizer link assembly LH to the front shock absorber assembly and front stabilizer bar with the 2 nuts.

      Torque: 74 N*m (755 kgf*cm, 55 ft.*lbf) 

      HINT: 

      If the ball joint turns together with the nut, use a 6 mm hexagon wrench to hold the stud bolt.

  10. INSTALL FRONT STABILIZER LINK ASSEMBLY RH 

    HINT: 

    Perform the same procedure as for the LH side.

  11. CONNECT TIE ROD ASSEMBLY LH 

    Refer to PROCEDURE - Step 11