Installation [12/2013 - ]: Procedure
- INSTALL NO. 1 VACUUM SWITCHING VALVE
- Install the No. 1 vacuum switching valve to the bracket with the screw.
Torque: 3.4 N*m (35 kgf*cm, 30 in.*lbf)
- Install the No. 1 vacuum switching valve to the bracket with the screw.
- INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
- Install the No. 1 vacuum switching valve assembly with the bolt.
*1 No. 1 Air Hose *2 No. 2 Vacuum Hose Assembly Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the No. 1 air hose and No. 2 vacuum hose assembly to the No. 1 vacuum switching valve assembly, and slide the 2 clips to secure them.
- Connect the connector.
- Install the No. 1 vacuum switching valve assembly with the bolt.
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 67 , or refer to PROCEDURE - Step 67